HomeAbout usService
Inquiry Blog Contact us


FAQS
Delivery time
 Usually, our delivery time is 5 to 8 days after order confirmed


Payment methods
 Payment by wire transfers(T/T) ,Western Union and L/C would be appreciated


Customizing a lamp
Our products can be made subject to CE, UL, TUV,PSE,SAA standard to meet the electrical requirements of many countries.


Warranty
 All of products,we provide 3 years warranty,at least use 30,000 Hours


LED Tubes T5 series
Product Information

 1.Specification:

Item No.

SJ-T50112

SJ-T50112

SJ-T50109

SJ-T50106

Dimension

24*1200mm

24*1200mm

24*900mm

24*600mm

Qty & SMD

120 pcs SMD3014

96 pcs SMD3014

72 pcs SMD3014

48 pcs SMD3014

Color Temp.

warm white:3000-3500k / commercial white:4000-4500k / white:5500-6000k

Luminous Flux

>1500 lm

>1300 lm

>847 lm

>600 lm

Power

18w

14 w

10 w

7 w

Input Voltage

100-260v 50Hz/60Hz

100-260v 50Hz/60Hz

100-260v 50Hz/60Hz

100-260v 50Hz/60Hz

CRI

RA>75

RA>75

RA>75

RA>75

Power Factor

>90

>90

>90

>90

Inbreaking Pro.

IP 33

IP 33

IP 33

IP 33

Life Time

> 30000 Hrs

Beam Angle

130

Cover

Frosted cover / Transparent cover

Material

Alum.+PC cover

3M illuminance

48 Lux

37 Lux

25 Lux

17 Lux

Humidity

10%-90%

10%-90%

10%-90%

10%-90%

Temperature

-20-55

-20-55

-20-55

-20-55

Withstand voltage test

500V/AC.10mA,3S


2.Luminous flux test(1200mm)

3.Light intensity(1200mm)


4.Illuminance diagram(1200mm)

5.Package
    

 

Packing size(mm)

Box/Carton

Total

N.W/G.W£¡¡ìKg£©

Giftbox Demension

1220*29*29

1PCS/Box

1PCS

0.34/PCS

Carton Demension

1265*300*270

72PCS/Carton

72PCS

26/PCS

6.Application Range

Home, hotel, hotel, property development, hospitals and other public corridor area.

7.Install

1)Single-ended power


2) double-ended power
  

8.Matters needing attention

1.before power up, please confirm the working voltage is correct, and then use the right voltage for power supply products, misconnection voltage products may cause permanent damage. Charging contacts do not use any part of the body after the LED lights cup at the bottom of the live part, otherwise you will have get an electric shock risk.

2.preliminary budget, the quantity of product required, and then according to the budget amount and the rated power of a single product, calculate the total power, and design the distribution plan;

3.in broke open the packing before use, please verify if there is any damage in transit. If there is damaged, please immediately notify the supplier and stop using the damaged products.

Temperature around 4, if the product appear larger fluctuation, don't immediately connected to power supply, the heat generated in the steam may damage the product, be sure to wait until the lamps and lanterns can reach room temperature before using the power supply is connected;

5.before the installation, ensure the installation position can be 10 times the weight of the product. Installed on no vibration, no swing, no fire hazard level ground;

6.this product at work, the light body shell temperature can reach up to 40 ¡æ, should let the lamps and lanterns from equipment sensitive to temperature. Lamps and lanterns for semiconductor lighting products, particularly sensitive to ambient temperature, working environment temperature is higher than 45 ¡æ to be greatly shorten its service life. Reason should keep away from heat source, the lamps and lanterns of lamps and lanterns work environment ventilated breathe freely, to ensure the appropriate environmental temperature. If working environment temperature of lamps and lanterns during usage at 0 ¡æ to 25 ¡æ, its life can be longer;

7, product in use process, in a short period of time often power outages, otherwise easy to burn.

Eight, to ensure that the products are in good condition, and the use of safe, please follow this instruction on the instructions and reminders.